Analysis of Maintenance Planning and Scheduling of Plastic Packaging Production Machine Spout Products with RCM, RAM, and Preventive Maintenance Methods at PT. X
Keywords:
Mesin Produksi Plastik, Preventive Maintenance, RCM, RAMAbstract
PT. X is a plastic packaging manufacturing company, based on machine comparison in 2023, the spout assembly machine is the most critical machine because of the high frequency of downtime, which is 106 times. With the RCM method and RAM determination of critical components determined by FMEA, the RPN value at the very high-risk level (> 200) is; line feeder (681), gear (608), electric sensor (440) and pneumatic (224). Reliability value electrical sensor component 0.5 at (t) = 96 operating hours, transmission (t) = 108 operating hours, line feeder (t) = 120 operating hours, and pneumatic (t) = 729 operating hours. Maintainability of line feeder components maximally maintained for 3 hours = 81.1%, transmission 5.5 hours = 82%, electrical sensor 1.5 hours = 84.6%, pneumatic 2.5 hours = 83%. The results of maintainability value have been included in the IVARA standard (80%). Inherent Availability (AI) and Operational Availability (AO). AI of line feeder = 98%, transmission = 98%, electric sensor = 99%, and pneumatic = 99%. While the AO value of the line feeder component = 94%, transmission = 92%, electric sensor = 94%, and pneumatic = 85%. AI percentage reached IVARA level, but AO percentage did not reach IVARA level (95%). Maintenance schedule planning is: line feeder repair = 15 days, replacement = 8 weeks, gear; repair = 8 days, replacement = 9 weeks, electric sensor; repair = 178 days, replacement = 50 weeks, pneumatic; repair = 118 days, replacement = 33 weeks. Through the predetermined maintenance cost savings for the company with the comparison results, the estimated savings is Rp83,881,208 or 51.9%
References
W. Dwi Ramadhan dan A. Endih Nurhidayat, “Analisis Perawatan Mesin dengan Menggunakan Metode Reability Centered Maintenance dan Fuzzy Fuzzy Failure Mode and Effect Analysis,” Jurnal Indonesia Sosial Teknologi, Vol. 3, No. 08, Agustus 2022, pp. 867-878, DOI: 10.36418/jist.v3i8.474.
M. Indra Syafei dan Endang Suhendar, “Analisis Perawatan Mesin dengan Pendekatan Metode Reliability Centered Maintenance (RCM) dan Maintenance Value Stream Map (MVSM) (Studi Kasus di PT. Nusa Indah Jaya Utama),” Integrasi: Jurnal Ilmiah Teknik Industri, Vol. 7, No. 2, Oktober 2022, pp. 67-75, DOI: 10.32502/js.v7i2.4783.
Ignatio D. Pranowo, “Sistem dan Manajemen Pemeliharaan,” 2019, (Sleman: Deepublish Publisher).
Dede Sudrajat, “Pengaruh Preventive Maintenance Terhadap Hasil Produksi pada Proses Produksi Mesin Area Line D di PT. Triangle Motorindo,” 2016, Universitas Negeri Semarang.
A. Fauziyyah dan S. Sriyanto, “Analisis Perhitungan Biaya Perawatan Sebagai Dasar Evaluasi Penggantian Mesin CTCM (Continuous Tandem Cold Mill) Pada Divisi Cold Rolling Mill PT. Krakatau Steel,” Industrial Engineering Online Journal, Vol. 4, No.1, April 2016, pp. 1-7.
M. Ridwansyah, D. Nusraningrum, dan A. H. Sutawijaya, “Analisis Overall Equipment Effectiveness untuk Mengendalikan Six Big Losses pada Mesin Pembuatan Nugget,” Indikator, Vol. 3, No. 1, Januari 2019, pp. 38-51.
M. I. Haq dan D. Riandadari, “Penentuan Penjadwalan Preventive Maintenance Pada Komponen Mesin Callender di PT. Karet Ngagel Surabaya Wira Jatim,” Jurnal Pendidikan, Vol. 9, No. 1, Juli 2019, pp. 8-6.
B. D. Cahyabuana dan A. Pribadi, “Konsistensi Penggunaan Metode FMEA (Failure Mode Effects and Analysis) terhadap Penilaian Risiko Teknologi Informasi (Studi kasus: Bank XYZ),” 2015, Institut Teknologi Sepuluh Nopember, 9.
I Latib dan C. O Doaly, “Usulan Penjadwalan Penggantian dan Pemeriksaan Komponen Kritis Mesin Feeder dan Fanblower (Studi Kasus di PT. Petnesia Resindo),” Jurnal Teknik Industri, Vol. 8, No. 2, Juli 2018, pp. 93-104.
P. Dwiyanti, T. Lasalewo, dan A. Rasyid, “Penjadwalan Perawatan Nitrogen Air Compressor Menggunakan Metode Reliability Availability Dan Maintainability (RAM),” Radial: Jurnal Peradaban Sains, Rekayasa dan Teknologi, Vol. 11, No. 2, Desember 2023, pp. 366-380,.
F. Setiawan, E. Sofyan, dan M. Hadi, “Perencanaan Preventive Maintenance Ram Air Actuator pada Pesawat Boeing 737 Next Generation Menggunakan Metode Reliability Di PT. GMF Aeroasia,” Journal of Applied Mechanical Engineering and Renewable Energy, Vol. 1, No. 2, Agustus 2021, pp. 53-62, DOI: 10.52158/jamere.v1i2.246
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Daniel Chrisnanda, Etik Puspitasari

This work is licensed under a Creative Commons Attribution 4.0 International License.